![]() Dedicated to the Promotion and Preservation of American Muscle Cars, Dealer built Supercars and COPO cars. |
|
Register | Album Gallery | Thread Gallery | FAQ | Community | Calendar | Become a Paid Member | Today's Posts | Search |
![]() |
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
![]()
Norwood Plant engineering had a hand full of 427 cars to test most evenings out back by rail load out during production.
The estimate came from the engineer who was responsible for the actual physical testing. He stated he tested in total "several hundred cars" as a required control group from 427 production. Testing was limited to two cars per shift during the build period or a 50% production control grouping. |
The Following User Says Thank You to 70 copo For This Useful Post: | ||
Z-11 396 (07-01-2019) |
![]() |
|
|