Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #27  
Old 01-28-2015, 05:13 PM
70 copo 70 copo is offline
Senior Member
 
Join Date: Oct 2000
Location: chillicothe Ohio 45601
Posts: 3,834
Thanks: 219
Thanked 1,241 Times in 578 Posts
Default Re: Julian Date Codes vs Cowl Tag Build Dates

Eddie,

For Norwood, likely the best we can do today is to perhaps triangulate the Fisher build date, the shipper date and to a lesser extent the VIN. I think in most cases you can reliably determine the week of production.

Given the normal production duration from the drop of the floor pan to road and roll you are already 2 business days into production on a single unit. Allowing for any repairs-potential re inspection(s) and vehicle transfer over to the "OK lot", all is left is transition to the method of shipment. Either loading to rail (at rail load out) or direct to trucks via Complete Auto Transport both of these were at plant at the rear of the plant near the Foral Ave gate.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:28 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.