Norwood Plant engineering had a hand full of 427 cars to test most evenings out back by rail load out during production.
The estimate came from the engineer who was responsible for the actual physical testing.
He stated he tested in total "several hundred cars" as a required control group from 427 production. Testing was limited to two cars per shift during the build period or a 50% production control grouping.
|