Go Back   The Supercar Registry > General Discussion > Mopar


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 11-08-2022, 12:47 AM
GMC_Typhoon GMC_Typhoon is offline
Senior Member
 
Join Date: Dec 2003
Location: Nashville
Posts: 410
Thanks: 2
Thanked 167 Times in 67 Posts
Default

Quote:
Originally Posted by njsteve View Post
Got the 2023 Purchase Order Contract (POC) today with the VON (Vehicle Order Number). So the car is officially in process in the Dodge computer system.

Though it says "Restriction" at the moment which basically 95% of the orders say. A couple guys already have their VONS and VINs issued and are scheduled, which means they won the lottery of "you didn't pick an option whose parts are on backorder". A lot of people have found out that things like sunroofs and specific interior trim options like the carbon fiber dash, are slowing up the orders.

That magical "5N9 Guaranteed Schedule" code means it is a car that was allocated to the dealer and the allocation was confirmed. If you ordered one of these at a non-allocated dealer, there won't be any 5N9 code on the POC...and there will be no car built.

And I just noticed that it now says "October Production" so this may be an 11 month wait! LOL
Brass Monkey wheels? Sounds awesome https://youtu.be/acY2VSskD80
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:08 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.