Dedicated to the Promotion and Preservation of American Muscle Cars, Dealer built Supercars and COPO cars. |
|
|||||||
| Register | Album Gallery | Thread Gallery | FAQ | Members List | Calendar | Become a Paid Member | Search | Today's Posts | Mark Forums Read |
|
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
|||
|
|||
|
1. what is the R value on the roll up door?
2. What brand is the roll up door?
__________________
Don't believe everything you read on the internet ... Ben Franklin |
|
#2
|
||||
|
||||
|
Looking real good boys! That’s going to be quite a set up!
__________________
Sam... ![]() |
|
#3
|
||||
|
||||
|
Quote:
R factor is somewhere between R14 and R20. Paul
__________________
1971 W30 convert, triple green,second owner. 1971 W30 Convert, special order Rally red, completed 68 Camaro Z28,Corvette Bronze,Houndstooth 2016 Porsche Carerra Cab and 2021 C63S AMG ,modern fun. www.vancouverclassiccars.com |
|
#4
|
||||
|
||||
|
The door is manufactured locally in Vancouver BC by Smart Garage Door, the door insulation doesn't have a specified R rating, instead its described as "Reflective 98% Thermal Break Radiant Barrier Blanket".
Last edited by Edgemontvillage; 06-03-2018 at 05:16 AM. |
|
#5
|
||||
|
||||
|
|
|
#6
|
||||
|
||||
|
Thanks Sam,after the steel siding is on,we are in the done column for building envelope.
There will always be minor stuff.
__________________
1971 W30 convert, triple green,second owner. 1971 W30 Convert, special order Rally red, completed 68 Camaro Z28,Corvette Bronze,Houndstooth 2016 Porsche Carerra Cab and 2021 C63S AMG ,modern fun. www.vancouverclassiccars.com |
|
#7
|
|||
|
|||
|
Thanks.
__________________
Don't believe everything you read on the internet ... Ben Franklin |
|
#8
|
||||
|
||||
|
Last post,June 6, a lot has happened, all with the intention of completing the last yard, more like the last mile.
What did we do? Completed siding. Completed Drainage New compressor. First the building. In the fall I ordered all the steel and trim I needed(or thought I needed) to complete the building. with the front construction completed by the end of May it was time to install the last of the trim and sheeting. Obstacle #1, some of the drip rail has been used inside so we were short. Ordreed up the two pieces, new pieces were not wide enough, re order, wait one more week. Got all trim in place and started on installing the siding, many cuts needed to be made on the remaining sheets and I calculated we would finish the job with no extra sheets,wrong. On Friday July 13 ,installing the last sheet I found it was a leftover from the side and 1 inch shorter. Re order time!!!! The guys at Dicks Lumber responded quickly and by Wednesday we had what we needed, not one sheet but two, they must have decided ,"these guys always screw up the order so lets ship an extra, we know they will need it". Sooooooooooo, finally on Friday July 20th, the last sheet went up!!!! Lloyd, ready to cut. ![]() Measuring for the screw holes: ![]() Driving the last screw. ![]() And so we are finished the exterior of the building 2 years and 5 months after we started. ![]() A view from the inside: ![]() Next post will be about the drainage.
__________________
1971 W30 convert, triple green,second owner. 1971 W30 Convert, special order Rally red, completed 68 Camaro Z28,Corvette Bronze,Houndstooth 2016 Porsche Carerra Cab and 2021 C63S AMG ,modern fun. www.vancouverclassiccars.com Last edited by Canuck; 07-31-2018 at 07:36 PM. |
| The Following 3 Users Say Thank You to Canuck For This Useful Post: | ||
|
#9
|
||||
|
||||
|
Next is the landscaping...
|
|
#10
|
||||
|
||||
|
Lol
__________________
I ain't nobody, dork. |
![]() |
| Thread Tools | |
| Display Modes | |
|
|