What I had at this point was a new concreted work area that abutted the existing concrete work areal. The old area is all clear span, thanks to the massive double 18 inch LVL beam that we installed and an even larger cable supported beam set up that was done some time before WWII (the big one, as Archie Bunker would say). The first pic below shows how they replaced two (2) support posts with the cable tie system. That would be interesting to watch.

To go clear span on the entire work area would have required new construction to the point of meeting all modern building codes. I don’t believe we even had a modern building code when this was built in 1919; and I sure wasn’t willing to try to bring this structure up to modern standards. May as well bull doze it and start over.

I posted the pic of the couble 18 inch LVLs a while back, but here is a reminder.
Attached Images
  
__________________
Don't believe everything you read on the internet ... Ben Franklin
Reply With Quote
The Following User Says Thank You to Lynn For This Useful Post:
markinnaples (02-02-2020)
  #2  
Old 02-02-2020, 07:36 PM
m22mike's Avatar
m22mike m22mike is offline
Senior Member
 
Join Date: Jan 2006
Location: West of CAK
Posts: 5,001
Thanks: 766
Thanked 840 Times in 406 Posts
Default

The cable beam is very cool
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:19 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.