Go Back   The Supercar Registry > General Discussion > Technical & Restoration


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3  
Old 07-09-2014, 12:13 PM
bergy's Avatar
bergy bergy is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Pennsylvania, Florida
Posts: 2,845
Thanks: 952
Thanked 1,561 Times in 417 Posts
Default Re: L78 head dates

Remember that the head dates are cast in at the foundry. To be the same day - the head had to be cast, work its way all the way through cooling and finishing (6-7 hours at best), ship to the motor plant (next door), get all the way through head machining & build, transport to the engine build line, and install. All that had to happen in 16 to 18 hours (start of foundry first shift to end of motor plant second shift). Not impossible, but WHEW!
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:59 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.