Go Back   The Supercar Registry > General Discussion > Lounge


Reply
 
Thread Tools Display Modes
  #1  
Old 11-03-2011, 05:34 PM
napa68's Avatar
napa68 napa68 is offline
SCR Sponsor
 
Join Date: Oct 2008
Location: Presque Isle, WI
Posts: 4,030
Thanks: 6,294
Thanked 6,141 Times in 1,465 Posts
Default Re: 1959 Bel Air Winter Project

Ah haaaa! He's a good friend!
Reply With Quote
  #2  
Old 11-04-2011, 12:00 AM
Xplantdad's Avatar
Xplantdad Xplantdad is offline
Moderator
 
Join Date: Sep 2004
Location: AZ
Posts: 32,667
Thanks: 8,224
Thanked 6,255 Times in 2,117 Posts
Default Re: 1959 Bel Air Winter Project

Ken, Is there anyone you DON'T know? [img]<<GRAEMLIN_URL>>/smile.gif[/img]
__________________
Bruce
Choose Life-Donate!
Reply With Quote
  #3  
Old 11-04-2011, 01:29 AM
kwhizz kwhizz is offline
Yenko Contributing Member
 
Join Date: May 2004
Location: LS Make'um Better Guy
Posts: 7,750
Thanks: 911
Thanked 694 Times in 205 Posts
Default Re: 1959 Bel Air Winter Project

<div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: Xplantdad</div><div class="ubbcode-body">Ken, Is there anyone you DON'T know? [img]<<GRAEMLIN_URL>>/smile.gif[/img] </div></div>


LOL...........
__________________


The Best things in life......Aren't Things
Reply With Quote
  #4  
Old 11-07-2011, 03:37 AM
napa68's Avatar
napa68 napa68 is offline
SCR Sponsor
 
Join Date: Oct 2008
Location: Presque Isle, WI
Posts: 4,030
Thanks: 6,294
Thanked 6,141 Times in 1,465 Posts
Default Re: 1959 Bel Air Winter Project

Not much to show today. Spent the day working on the remote power steering resevoir and start to tidy up wiring. I should have some small fittings and the proper molded hose for the power steering. After that, I can get the accessory drive operational, bleed the brakes, and fit the acellerator.







Gotta figure out how I can / want to mount the ECM



Getting further, not so much wiring laying around





Go Pack Go!


Reply With Quote
  #5  
Old 11-30-2011, 02:17 AM
napa68's Avatar
napa68 napa68 is offline
SCR Sponsor
 
Join Date: Oct 2008
Location: Presque Isle, WI
Posts: 4,030
Thanks: 6,294
Thanked 6,141 Times in 1,465 Posts
Default Re: 1959 Bel Air Winter Project

The 59 made it's maiden voyage on Sunday. Dead battery in the camera to commemerate!

A lesson to all..................Air Ride + Muscle Bars does not equal tailpipes.

Dropped the 59 off at the exhaust shop today. The ability to have tailpipes looks slim!

I'll am going to try to stop tomorrow at the exhaust shop to snap a pic or two.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:49 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.