Go Back   The Supercar Registry > General Discussion > Member's Rides


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #37  
Old 09-01-2025, 05:06 PM
OneStopRestoration OneStopRestoration is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Washington, Illinois
Posts: 290
Thanks: 85
Thanked 1,508 Times in 219 Posts
Default ON The downhill for Bodywork

Body is finally complete. Seam sealed and guide coated before paint. First step is chassis black on the floor pans. Seam sealing items like the doors and trunk. Should be putting down edge paint next weekend.
Attached Images
     
Reply With Quote
The Following 21 Users Say Thank You to OneStopRestoration For This Useful Post:
1967 4K (09-02-2025), 69M22Z (09-01-2025), big gear head (09-02-2025), carnut4life (09-01-2025), cheveslakr (09-01-2025), chevyman0429 (09-07-2025), Dave Rifkin (09-05-2025), dykstra (09-02-2025), Hawkeye (09-01-2025), L78_Nova (09-02-2025), mhurd (09-01-2025), napa68 (09-02-2025), olredalert (09-01-2025), orig69ss (Today), PeteLeathersac (09-01-2025), ragtop (09-01-2025), RPOLS3 (09-01-2025), ruralrte66 (09-02-2025), scuncio (09-01-2025), SMS (Yesterday), Tenney (09-02-2025)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:04 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.