Hello, I have a question about a Chevelle build date on the build sheet. I’m sure it varied from assembly plant to plant but would it be possible to have a cars build sheet date and protect o plate date be only 11 days apart? Is there a typical time frame? Thanks for any info. Shane
|
#2
|
||||
|
||||
![]()
The Chevelle build date on the build sheet is only a scheduled date and many times not the actual build date. With regards to the 1970 Chevelles, I often times see a spread of several days. Not sure I have ever seen one that far apart but it would certainly be plausible if something happened in the scheduling of the car.
__________________
Rick Nelson Musclecar Restoration and Design, Inc (retired) www.musclecarrestorationanddesign.com https://www.youtube.com/watch?v=62r-6vgk2_8 specialized in (only real) LS6 Chevelle restorations |
The Following 4 Users Say Thank You to SS427 For This Useful Post: | ||
#3
|
|||
|
|||
![]()
if you’re interested in the actual build date order the shipping data report from Chevy Muscle Docs: https://www.chevymuscledocs.com/
__________________
[email protected] |
The Following 3 Users Say Thank You to fsc66 For This Useful Post: | ||
#5
|
|||
|
|||
![]()
I just entered a car with a date of 12/15 on the broadcast sheet and date on pop was only 5 days later. Definitely possible if it was a customer ordered car and plant wasn't far from dealer
__________________
381 and counting in the 67-69 Impala SS427 registry |
The Following User Says Thank You to TAR6569 For This Useful Post: | ||
Gasrat (03-02-2025) |
#6
|
|||
|
|||
![]()
Kurt, yes the delivery date on the protect o plate tape.
|
![]() |
|
|