View Single Post
  #3  
Old 11-18-2020, 01:34 PM
HawkX66's Avatar
HawkX66 HawkX66 is offline
Senior Member
 
Join Date: Sep 2015
Location: VA/MA
Posts: 1,021
Thanks: 1,015
Thanked 222 Times in 132 Posts
Default

Quote:
Originally Posted by William View Post
Z/28 engine production was typically close to final assembly, Norwood in particular. There are many Norwood Z/28s built several days after their engines. In the January-February time frame, there are 4 examples built the next day; 8 built 2 days later. The Flint engine plant was a 5 hour drive from Norwood so not out of the question.

After March, the span increases. Must have added capacity.

Norwood: V0203DZ-V0213DZ
Van Nuys: V0203DZ-V0206DZ

For the most part, engine dates increment with VINs.

Castings vary, no FIFO. Mid-January to early February for later engines.
Thanks William. I know Lloyds 02B has an 0206 DZ. Would you consider 0130 to be a good date or would that be too early? Seems like a week earlier is plausible, but I haven't seen any examples. Mine is a Norwood car.
__________________
-Dave
Semper Fi!

69 Camaro SS396 L34 X66

Last edited by HawkX66; 11-18-2020 at 01:39 PM.
Reply With Quote