When the BB block was scheduled at the beginning of the assembly line, at the bore air-gage station, its suffix code was scrawled on the side of the block - that's what everyone looked at as it came down the line to tell them what components to install, and that's what the pad stamp operator looked at to select the correct date/suffix gang-stamp holder. The heads went on after the pad was stamped.