View Single Post
  #33  
Old 02-01-2025, 11:01 PM
LetsFNgo's Avatar
LetsFNgo LetsFNgo is offline
Yenko Contributing Member
 
Join Date: Aug 2023
Location: Central NJ
Posts: 281
Thanks: 187
Thanked 1,205 Times in 196 Posts
Default

Pretty big day today.
Finally was able to pick everything up from the machine shop. Scott got everything finished up late last night so myself, my dad, and my son took a ride to go pick everything up.
Block had all the standard work done, as well as a bunch of AMC specific stuff drilling holes and cleaning up casting flaws.
Crank is .030 under and balanced for the new rotating assembly
Heads are port matched, ported and cleaned/polished. Chambers were softened for the boost plans. Ended up with a 62cc chamber. Intake flowed 260 at 500 and the exhaust flowed 210(?) I think. Those were from memory. Scott wrote everything down I forgot the sheet.
Got everything home and unloaded and the engine is on the stand. I have most of the major parts except the head gaskets. I could probably have the engine together in about a weekend.
All the clearances are set at .003. Mains and rods were all kept the same.
Attached Images
      
__________________
AMC weirdo
1969 SC/Rambler
1971 SC360 Hornet
1968 Rambler Gasser-under construction
1970 A66 Challenger- now 440+6
Reply With Quote
The Following 5 Users Say Thank You to LetsFNgo For This Useful Post:
69M22Z (02-02-2025), big gear head (02-02-2025), dykstra (02-03-2025), L_e_e (02-01-2025), PeteLeathersac (02-02-2025)