new shop progress
Got some things cleaned up. Ordered 17 tons of 3/4 crusher for the front of the shop for now. Spread by hand for about 5 hours. Then neighbor came over with baby John Deere and helped with the rest. So no mud for winter. Maybe concrete later.
Got a couple sheets of plywood cut. Hung them on screws. Used a clamp and the scissor lift to raise them up and set them on the screws at the correct height. Screwed them off. Set the mini split brackets and drilled the holes for the line sets and control wires. Hung both units.
|