| 
			
			 
			
				12-07-2018, 03:07 AM
			
			
			
		 | 
	| 
		
			|  | Senior Member |  | 
					Join Date: Mar 2017 Location: ABQ, New Mexico 
						Posts: 36,633
					 Thanks: 3,506 
		
			
				Thanked 136,556 Times in 22,784 Posts
			
		
	      |  | 
	
	| 
 
			
			 In 2010, during construction of the new World Trade Center in New York City, Subway engineered a mobile sandwich shop in a shipping container. The “restaurant” could be raised or lowered up the scaffolding of the building so that workers needn’t waste their 30-minute lunch breaks descending and ascending stairs or elevators to grab lunch. |