Re: 1975 Yenko Trans Am
Lynn:
According to the original Yenko Chevrolet Work Order signed by Frank Yenko, they did the following:
Install L88 Engine
R&R gas tank cutout neck for high test gas
Build distributor for engine
Fabricate motor mounts
Fabricate alternat and p.s. brackets
Fabricate accelerator linkage
Rewire alternator, starter and gauges
Install new oil pan and starter nose
Fabricate new gas line
Install 4.10 Gearset
Install Lakewood bell housint
Operational Checkup
This is how the receipt reads. There are also 3 receipts for parts and 1 signed by Don Yenko for the L88 Enagine
Ed
__________________
... some old Chevrolets and Pontiacs.
|