| 
				 Re: 1975 Yenko Trans Am 
 
			
			Lynn:
 According to the original Yenko Chevrolet Work Order signed by Frank Yenko, they did the following:
 
 Install L88 Engine
 R&R gas tank cutout neck for high test gas
 Build distributor for engine
 Fabricate motor mounts
 Fabricate alternat and p.s. brackets
 Fabricate accelerator linkage
 Rewire alternator, starter and gauges
 Install new oil pan and starter nose
 Fabricate new gas line
 Install 4.10 Gearset
 Install Lakewood bell housint
 Operational Checkup
 
 This is how the receipt reads. There are also 3 receipts for parts and 1 signed by Don Yenko for the L88 Enagine
 
 Ed
 
 
				__________________... some old Chevrolets and Pontiacs.
 |