![]() |
Graphic application
I will be painting my Nova with PPG urethane 2 stage CC/CC system. How long should I let the paint "dry" before applying the graphic decals? Thanks ... TAZ
|
Re: Graphic application
In the collision industry we put graphics on the same day using fast drying clear. I never seen a decal bubble but I have seen a heavier moulding held on with double sided tape come loose after the solvents evaporated. With that said, I would wait three months, the same amount of time before we tell customers to wait before applying a silicon based wax. Dustin
|
Re: Graphic application
I agree,no sooner than 3-6 mos.,if not longer.
|
All times are GMT. The time now is 07:12 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.